GM Trucks (Production Updates)

Last Updated: 09/19/16
Bold indicates latest update. Letter after date corresponds to main category.


*Lead time estimates factor in normal transportation time of 10-14 days. Please add an additional one to three weeks on vehicles destined for the Western States, Alaska, Hawaii or east and west provinces of Canada. Please add an additional 4-6 weeks for orders requesting Special Equipment or Special Paint Options (SEO).

MODEL ESTIMATED LEAD TIME IN WEEKS* KEY PRODUCTION INFORMATION
2017 Cadillac Escalade ESC/Escalade ESV 9
  • No restrictions

Cadillac SRX N/A  
  •   1SA package may increase lead time by 4 weeks or more due to supplier restrictions.
2017 Chevrolet Colorado/GMC Canyon NA

  • Diesel engine (LWN) may increase lead time by4 weeks or more due to supplier restrictions.
  • RS1 Wheel, Aluminum 16 x 7 (PCX) not available
  • Crew Cab (1**43) not available
2017 Chevrolet Equinox 9

  • Midnight Package(PDR) Sport Package (PDT) and may increase lead time by 4 weeks or more due to supplier restrictions.
2017 Chevrolet Express/GMC Savana 7

  • Special (SEO) Paint (01U) Not available until February
2017 Chevrolet Silverado/GMC Sierra 1500 Series Regular Cab 11-12

  • Dark Slate (GPA) Metallic on constraint until October
  • Pepperdust Metallic (GMU) on constraint until October

2017 Chevrolet Silverado/GMC Sierra 1500 Double and Crew Cab 10-11  

  • Leather Bucket / Cloth Bucket Seats (AN3/A95) may increase lead time by up to 4 weeks or more due to supplier restrictions
  • Power Assist Steps (BRS) on constraint until October
  • Graphite Metallic (GPA) On Constraint until October
  • Pepperdust Metallic (GMU) On Constraint until October

2017 Chevrolet Silverado/GMC Sierra 2500 HD and 3500 Regular Cab 11-12  

  • Diesel engine (LML) may increase lead time by 4 weeks or more due to supplier restrictions
  • 20" Aluminum Wheel (RQA) on Sierra may increase lead time by 4 weeks or more due to supplier restrictions
  • Midnight Edition with Trailering Mirror (C*2**43 &PDY&DQS) on constraint until December.
2017 Chevrolet Silverado/GMC Sierra 2500 HD and 3500 Double and Crew Cab 11-12  

  • 1LT / LTZ / SLE / SLT Models may increase lead time by 4 weeks or more due to supplier restrictions
  • Diesel engine (LML) may increase lead time by 4 weeks or more due to supplier restrictions
2017 Chevrolet Silverado/GMC Sierra 3500 HD Chassis Cab 11-12  
  • No restrictions
2017 Chevrolet Tahoe/

Yukon/

Denali Yukon

10

  • 5SA Denali may increase lead time by 4 weeks or more due to supplier restrictions- Yukon
  • SLT Package (4SA) may increase lead time by 4 weeks or more due to supplier restrictions - Yukon  
  • PCK Luxury Package may increase lead time by 4 weeks or more due to supplier restrictions - Tahoe 
  • 1LZ Package or PCK Luxury Package or Texas Edition Package (1LZ/PCK/PDA)may increase lead time by 4 weeks or more due to supplier restrictions.
  • Body Side Moldings on 1FL/1LS/1LT Packages (B85/B86) may increase lead time by 2-4 weeks to supplier restrictions.
  • LPO-Body Side Moldings may increase lead time by 4 weeks or more due to supplier restrictions.

2017 Chevrolet Suburban/

Yukon XL/

Denali Yukon XL

10  

  • 22" Wheel (RPT) may increase lead time by 4 weeks or more due to supplier restrictions
  • 1LZ Package or PCK Luxury Package or Texas Edition Package may increase lead time by 4 weeks or more due to supplier restrictions - Tahoe
  • SLT Package on Yukon may increase lead time by 4 weeks or more due to supplier restrictions
  • 20" Wheel (RD5) may increase lead time by 4 weeks or more due to supplier restrictions - Yukon

2017 Chevrolet Traverse 9

  • Graphite Edition (HCR) may increase lead time by 2-4 weeks due to startup restrictions.
2017 GMC Acadia 10

  • AWD Acadia Models (TNJ26/ TNK26/ TNL26/ TNM26/ TNN26) may increase lead time 2-4 weeks due to start up restrictions.
2017 GMC Terrain 9
  • No restrictions
2017 Chevrolet City Express

25

  • LS Model(1LS&UD7) with Rear Park Assist may increase lead time by 2-4 weeks due to material restrictions.
  • LT Model(1LT&CWM) with Technology Package may increase lead time by 2-4 weeks due to material restrictions.
  • LT Model with Aluminum Alloy Wheel (1LT&RRG) may increase lead time by 2-4 weeks due to material restrictions.