Ford-Lincoln Trucks (Build Out Final Order Start Up Dates)

Last Updated: 5/29/20
Bold indicates latest update. Letter after date corresponds to main category.

MAKE MODEL 2020 INITIAL ORDERS ACCEPTANCE1  2020 SCHEDULING BEGINS1  2020 PRODUCTION START UP1  2020 FINAL ORDERS DUE TO DONLEN1  2020 FINAL ORDERS DUE DATE1  2021 INITIAL ORDERS ACCEPTANCE1  2021 SCHEDULING BEGINS1  2021 PRODUCTION START UP1 
Ford Econoline N/A2 N/A2 N/A2 N/A2 N/A2 9/16/192 10/17/192 01/02/202
Ford Ecosport 3/11/19 4/11/19 7/1/19 2/21/20 2/28/20 3/12/20 6/11/20 9/1/20
Ford Edge 07/15/19 9/12/19 9/30/2019 TBD TBD TBD TBD TBD
Ford Escape 5/13/2019 6/13/2019 08/19/19 TBD TBD TBD TBD TBD
Ford Expedition 07/17/19 08/15/19 10/14/2019 TBD TBD TBD TBD TBD
Ford Explorer 1/16/2019 2/28/2019 5/6/2019 3/27/20 4/3/20 7/13/20 8/13/20 9/21/20
Ford Ranger 8/12/19 9/12/19 11/18/19 TBD TBD TBD TBD TBD
Ford F150 07/15/19 9/12/19 DTP: 10/7/19
KC: 11/03/19
5/22/203 5/29/203 7/15/203 DTP: 8/13/20
KC: 8/27/20
DTP: 10/12/20
KC: 11/09/203
Ford F-Series Super Duty
F250/F350/F450/F550
08/14/19 9/12/19 KTP:11/04/2019
OHAP:11/18/2019
7/3/204 7/10/204 8/17/204 9/17/204 KTP: 11/02/20
OHAP: 11/09/204
Ford F650/F750 N/A2 N/A2 N/A2 N/A2 N/A2 9/16/192 10/17/192 2/3/202
Lincoln Corsair 5/16/2019 6/13/2019 8/19/2019 3/27/20 4/3/20 7/13/20 8/20/20 10/05/20
Lincoln Aviator 01/16/19 02/28/19 05/06/19 3/27/20 4/3/20 7/13/20 8/13/20 9/21/20
Lincoln Nautilus 07/15/19 9/12/19 9/30/2019 TBD TBD TBD TBD TBD
Lincoln MKZ 5/13/2019 7/18/2019 8/05/2019 TBD TBD TBD TBD TBD
Lincoln Navigator 07/17/19 08/15/19 10/14/2019 TBD TBD TBD TBD TBD
Ford Transit 7/15/19 8/15/19 10/21/19 TBD TBD TBD TBD TBD
Ford Transit Connect 2/11/2019 3/14/2019 5/6/2019 1/24/20 1/31/20 2/28/20 3/12/20 6/29/20


1 – All dates are estimated and subject to change.

2 – Ford Medium Trucks and E-Series will be skipping the 2020MY, transitioning directly from 2019MY to 2021MY with no gap in production.

3 – VSO Orders: Final order date is due to Donlen on 3/27/20 and due to manufacturer 4/3/20. VSO Order bank opening 7/13/20 and Job 1 is estimated 12/07/20.

4 – VSO Orders: Final order date due to manufacturer 6/5/20. VSO Order bank opening 9/14/20 and Job 1 is estimated 11/30/20.