Ford-Lincoln Trucks (Build Out Final Order Start Up Dates)

Last Updated: 8/18/20
Bold indicates latest update. Letter after date corresponds to main category.

MAKE MODEL 2020 FINAL ORDERS DUE TO DONLEN1  2020 FINAL ORDERS DUE DATE1  2021 INITIAL ORDERS ACCEPTANCE1  2021 SCHEDULING BEGINS1  2021 PRODUCTION START UP1  2021 FINAL ORDERS DUE TO DONLEN1  2021 FINAL ORDERS DUE DATE1  2022 INITIAL ORDERS ACCEPTANCE1  2022 SCHEDULING BEGINS1  2022 PRODUCTION START UP1 
Ford Econoline N/A2 N/A2 9/16/192 10/17/192 01/02/202 10/2/205 10/9/20 10/12/20 11/12/20 1/4/21
Ford Ecosport 2/21/20 2/28/20 3/12/20 6/11/20 9/1/20 TBD TBD TBD TBD TBD
Ford Edge 9/25/20 10/2/20 10/23/20 12/17/20 1/25/21 TBD TBD TBD TBD TBD
Ford Escape 9/25/20 10/2/20 10/12/20 11/19/20 1/04/21 TBD TBD TBD TBD TBD
Ford Bronco Sport N/A N/A 7/14/20 8/20/20 10/26/20 TBD TBD TBD TBD TBD
Ford Expedition 08/28/20 09/04/20 09/16/20 10/15/20 11/30/20 TBD TBD TBD TBD TBD
Ford Explorer 3/27/20 4/3/20 7/13/20 8/13/20 9/23/20 TBD TBD TBD TBD TBD
Ford Ranger 08/28/20 09/04/20 09/14/20 10/15/20 12/07/20 TBD TBD TBD TBD TBD
Ford F150 5/22/203 5/29/203 7/15/203 DTP: 8/13/20
KC: 8/27/20
DTP: 10/12/203

KC: 11/09/203

TBD TBD TBD TBD TBD
Ford F-Series Super Duty
F250/F350/F450/F550
7/3/204 7/10/204 8/17/204 9/17/204 KTP: 11/02/20
OHAP: 11/09/204
TBD TBD TBD TBD TBD
Ford F650/F750 N/A2 N/A2 9/16/192 10/17/192 2/3/202 10/2/205 10/9/20 10/12/20 11/12/20 1/4/21
Lincoln Corsair 3/27/20 4/3/20 7/13/20 8/20/20 10/05/20 TBD TBD TBD TBD TBD
Lincoln Aviator 3/27/20 4/3/20 7/13/20 8/13/20 9/21/20 TBD TBD TBD TBD TBD
Lincoln Nautilus 9/25/20 10/2/20 10/23/20 12/17/20 1/25/21 TBD TBD TBD TBD TBD
Lincoln Navigator 08/28/20 09/04/20 09/16/20 10/15/20 11/30/20 TBD TBD TBD TBD TBD
Ford Transit 9/25/205 10/2/20 10/12/20 11/12/20 1/11/21 TBD TBD TBD TBD TBD
Ford Transit Connect 1/24/20 1/31/20 2/28/20 3/12/20 6/29/20 TBD TBD TBD TBD TBD


1 – All dates are estimated and subject to change.

2 – Ford Medium Trucks and E-Series will be skipping the 2020MY, transitioning directly from 2019MY to 2021MY with no gap in production.

3 – VSO Orders: Final order date is due to Donlen on 3/27/20 and due to manufacturer 4/3/20. VSO Order bank opening 11/16/20 and Job 1 is estimated 2/01/21.

4 – VSO Orders: Final order date due to manufacturer 6/5/20. VSO Order bank opening 9/14/20 and Job 1 is estimated 11/30/20.

5 – VSO Orders: Final order date due to manufacturer 9/4/20. VSO Order bank opening 10/12/20 and Job 1 is estimated 2/8/21.

Make sure you have the right fleet vehicles for your business. Contact us today to learn how Donlen’s team can optimize your fleet.