Ford-Lincoln Trucks (Build Out Final Order Start Up Dates)

Last Updated: 4/23/21
Bold indicates latest update. Letter after date corresponds to main category.

Ford-Lincoln Trucks

MAKEMODEL2021 INITIAL ORDERS ACCEPTANCE1 2021 SCHEDULING BEGINS1 2021 PRODUCTION START UP1 2021 FINAL ORDERS DUE TO DONLEN1 2021 FINAL ORDERS DUE DATE1 2022 INITIAL ORDERS ACCEPTANCE1 2022 SCHEDULING BEGINS1 2022 PRODUCTION START UP1 
FordEconoline9/16/19210/17/19201/02/20210/2/20510/9/2010/12/2011/12/201/4/21
FordEcosport3/12/206/11/209/1/20TBDTBDTBDTBDTBD
FordEdge10/23/2012/17/201/25/21TBDTBDTBDTBDTBD
FordEscape10/12/2011/19/201/04/216/25/217/2/217/12/218/19/219/20/21
FordBronco Sport07/14/20
08/20/20
10/26/20
TBD6TBD6TBDTBDTBD
FordBronco1/19/213/18/215/3/21TBDTBDTBDTBDTBD
FordExpedition 09/16/2010/15/2012/1/2020TBDTBDTBDTBDTBD
FordExplorer7/13/208/13/209/23/20TBDTBDTBDTBDTBD
FordRanger09/14/2010/22/2012/07/20TBDTBDTBDTBDTBD
FordF1507/15/203DTP: 8/13/20
KC: 8/27/20
DTP: 10/12/203
KC: 11/09/203
TBDTBDTBDTBDTBD
FordF-Series Super Duty
(F250-F600)
8/17/2049/17/204KTP: 11/02/20
OHAP: 11/09/204
1/19/211/22/213/15/21KTP: 5/6/21
OHAP: 5/6/21
KTP: 6/24/21
OHAP: 7/20/21
FordF650/F7509/16/19210/17/1922/3/20210/16/20510/23/2010/23/2011/12/201/4/21
LincolnCorsair7/13/208/20/2010/05/206/25/217/2/217/12/218/19/219/20/21
LincolnAviator7/13/208/13/209/21/202/26/213/5/213/15/214/15/216/28/21
LincolnNautilus10/28/2012/17/201/25/21TBDTBDTBDTBDTBD
LincolnNavigator09/16/2010/15/2012/1/2020TBDTBDTBDTBDTBD
FordTransit10/23/2011/12/201/11/213/17/213/24/216/21/219/16/2111/8/21
FordTransit Connect2/28/203/12/206/29/2012/16/20612/18/2061/11/212/11/214/19/21

1 – All dates are estimated and subject to change.

2 – Ford Medium Trucks and E-Series will be skipping the 2020MY, transitioning directly from 2019MY to 2021MY with no gap in production.

3 – VSO Orders: Final order date is due to Donlen on 3/27/20 and due to manufacturer 4/3/20. VSO Order bank opening 11/16/20 and Job 1 is estimated 2/01/21.

4 – VSO Orders: Final order date due to manufacturer 6/5/20. VSO Order bank opening 9/14/20 and Job 1 is estimated 11/30/20.

5 – VSO Orders: Final order date due to manufacturer 9/4/20. VSO Order bank opening 10/12/20 and Job 1 is estimated 2/8/21.

6 – Badlands Series (R9D), Outer Banks (96T-AALET), Big Bend (96P-AALAP), Moonroof (17B-A1GAB) – Final orders due 4/30/21.