Nissan (Calendar)

Last Updated: 12/13/17
Bold indicates latest update. Letter after date corresponds to main category.


Vehicles ordered with fleet specs may reduce lead times by 4-6 weeks. You can anticipate lead times of up to 16 weeks or longer on vehicles ordered without fleet specs. To reduce lead times, we recommend trying to match your specs to the Nissan Fleet Specs.

Nissan

MODEL  PRODUCTION COUNTRY GENERAL LEAD TIME POPULAR SPEC LEAD TIME POPULAR SPEC CONTENT

370 Z

Japan

16-20 weeks

16-20 weeks

All fleet orders are built to order

Altima

USA

12-16 weeks

16-20 weeks

2.5 S with Floor mats & 2.5 S with Convenience Pkg.

Armada

USA

16-20 weeks

16-20 weeks

SV 4X4 & 4X2 with floor mats

Frontier

USA

16-20 weeks

16-20 weeks

SV CC 4x4 & 4x2 (V6-32415/32315) with Floor Mats and Bed Liner & S (4 cylinder-31015)

Kicks

Mexico

16-20 weeks

16-20 weeks

All fleet orders are built to order

Leaf

USA

16-20 weeks

16-20 weeks

SV (17117) with Floor Mats, S (17017) with Floor Mats

Maxima

USA

16-20 weeks

12-16 weeks

S (16117) with Floor Mats, SV (16217) with Floor Mats (

Murano

USA

16-20 weeks

16-20 weeks

S FWD & AWD (23117/23017) with Floor Mats, SV FWD & AWD (23217/23317) with Floor Mats

NV

USA

12-16 weeks

16-20 weeks

S 1500 Standard Roof with Power Pkg / SV 1500 Standard Roof Base / S 2500 Standard Roof with Power Pkg / SV 2500 Standard Roof / S High Roof V6 with Power Pkg

NV200

Mexico

12-16 weeks

16-20 weeks

Base / S with Rear Door Glass / S with Bluetooth and Cruise / S with Rear Door Glass and Bluetooth / SV Base / SV with Rear Door Glass / SV with NAV

Pathfinder

USA

12-16 weeks

12-16 weeks

SV 4x4 & 4x2 (25217/25317) with Floor Mats

Rogue

USA, Japan & Korea

16-20 weeks

16-20 weeks

S & SV FWD(22117/22317) & AWD(22217/22417) with Floor Mats, SV w/Premium, SL w/Premium

Sentra

Mexico

16-20 weeks

12-16 weeks

SV (11617) - with Floor Mats / S Plus (11517) with Floor Mats

Titan

USA

16-20 weeks

16-20 weeks

SV CC Gas 4x4 & 4x2

Versa Note

Mexico

16-20 weeks

12-16 weeks

SV (11617) - with Floor Mats / S Plus (11517) with Floor Mats

Versa Sedan

Mexico

16-20 weeks

12-16 weeks

1.6SV (11217) with Floor Mats / S Plus (11127) with Floor Mats

NVP

USA

16-20 weeks

16-20 weeks

TBD

Infiniti

MODEL PRODUCTION COUNTRY GENERAL LEAD TIME POPULAR SPEC LEAD TIME POPULAR SPEC CONTENT

Q50

Japan

16-24 weeks

16-24 weeks

3.0T Luxury RWD & AWD

Q60C

Japan

16-24 weeks

16-24 weeks

Luxury FWD & AWD with no options

Q70

Japan

16-24 weeks

16-24 weeks

Premium Package at minimum

Q70L

Japan

16-24 weeks

16-24 weeks

Luxury FWD & AWD with Essential Package

QX30

UK

24-28 weeks

24-28 weeks

Luxury FWD & AWD

QX50

Japan

16-24 weeks

16-24 weeks

TBD

QX60

USA

16-20 weeks

16-20 weeks

Premium Package FWD & AWD

QX80

Japan

16-24 weeks

16-24 weeks

Driver Assistance Package FWD & AWD

Make sure you have the right fleet vehicles for your business. Contact us today to learn how Donlen’s team can optimize your fleet.