Ford Trucks (Production Updates)

Last Updated: 05/7/19
Bold indicates latest update. Letter after date corresponds to main category.


*Lead time estimates factor in normal transportation time of 10-14 days. Lead time does not factor in upfitting. Please add an additional three to five weeks on vehicles destined for the Western States, Alaska, Hawaii. Please add 6-8 weeks of additional transport transport time for units heading to Canada.

MODEL ESTIMATED LEAD TIME IN WEEKS* KEY PRODUCTION INFORMATION
2019 Ford Flex 12-14
  • No restrictions
  • 2019 Ford Econoline 14-16
  • No restrictions
  • 2019 Ford Ranger 14-16
  • No restrictions
  • 2019 Ford F-150 12-14
    • 5.0L engine 10-12 week delay
    • Restricted paint will be scheduled in batches and may result in a scheduling delay of 6 or more weeks.Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF)
    2019 Ford Expedition 12-14
  • No restrictions
  • 2020 Ford Explorer 16-18
  • Base (K7B, K8B), XLT (K7D, K8D) will not schedule until June production (F1–F4) at the earliest due to 2020MY start-up restrictions.
  • FHEV not available until June 2019 (F1)
  • 2020 Ford Transit Connect 22-24
  • School Bus Yellow: Incremental 8 weeks
  • 2.5L Engine – High Risk additional 8 weeks - Job 1 5/6/2019
  • 2019 Transit 16-18
    • High Roof / High Roof Jumbo van
    2019 Lincoln MKC 14-16
  • No restrictions
  • 2019 Lincoln MKT 18-20
  • No restrictions
  • 2020 Lincoln Aviator 14-16
    • PHEV not available until July 2019 (G1)
    2019 Lincoln Nautilus 18-20
  • No restrictions
  • 2019 Lincoln Navigator 10-12
  • No restrictions
  • 2019 Ford F-Series Super Duty (F250 through F550) 16-18 F250/F350
    16-18 F450/F550
  • Max Payload option 68M – High risk constraint (14-16 Week delay)
  • Pls note: Restricted paint will be scheduled in batches and may result in a scheduling delay of 6 or more weeks.
    Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF),
    Green Gem (PN4DA), Pacific Gas/Electric Blue (PN4GC)

  • Possible 14-16 week delay for 40 gal AFT of axle fuel tank
  • Super Duty- Final order due date for 40 gallon AFT of axle fuel tank (standard on chassis cab) is 4/05/19
  • 2019 Ford F650/F750 14-16
  • Dura Brite Aluminum Wheels
  • Tracking System (eWID) – Enterprise Wired in Device (FJRAB) 4/29/19
  • Continental tire option TGA, RGA and RGB are balanced out for the model year